Search

Sunday, April 01, 2012

Remodelling Overload!


As you might already know, we are remodeling our Kitchen.  We are not exactly displaced because we have moved stuff around to accommodate the reconstruction but it is an inconvenience.  Fortunately, since this was caused by a water leak, our insurance is doing all it can to take care of the problem.  We cannot wait to get our Kitchen back and we know it will be worth it in the end.

In the meantime, here are some shots of what has happened so far in a "before"...."fixing"...and "after" type of sequence.

"Before" - Garage with torn down drywall and no insulation.
"Fixing" - Garage with insulation.

"Still Fixing" - Garage with dry wall!
Fixed!
"Before" - Cabinets Torn Down.  That bar counter is next.
"Post Demo" - Containment barrier with bar counter gone!
"Fixing" - Gas line capped off and hole sealed.
"Before" - TK+Jim helping re-frame where the can lights will be. 
"Fixing" - Can lights soon to be drywalled.
"Fixing" - Can lights and Insulation.
"Fixed" - Can Light + Drywall.
"Fixing" - Added Insulation after electrician added electrical.
"Fixed" - Drywalled and Mudded.
"Fixing" - Primed and Painted Ceilings and walls myself.
"Fixing" - Guadalupe's husband Jesus painted the rest of the house. 
"Fixing" - Hung the top cabinet boxes with Jim and TK's help. 
"Fixing" - Laminate floors removed
"Fixing" - New wood floors going in
"Fixed" - Wood floors done..next base cabinets.



No comments:

Post a Comment